Thursday, July 21, 2011

And then there was a slab

Today started early - the concrete pump truck arrived precisely at 0530 and the crew shortly thereafter.  The first concrete truck arrived at just about 6:00 - sunrise was not far behind.  The crew first filled the large strip footing and then worked their way from the SouthEast corner of the slab in a counterclockwise moved finishing at the center door on the South of the basement.  The job took just over 55 yards of concrete - 6 loads at 9 yards each and then 1 1/2 yard load.  All the concrete was poured by 9:00 and they first hand screed it, floated it with a bull float, and then, as it set, a pair or power-trowels were used to finish it.  Hand work is still a premium here as they finished all the edges and around pipes with hand trowels.  Water applied during the "polishing" phase - not really polished concrete but a very smooth, hard finish for the whole thing.

  The amazing thing to a newbie is that they were walking on the surface of the concrete within 4 hours and it was hard enough that a power saw was used to cut the control joints within about 8 hours.  Clayton's crew was another of those well-oiled machines with each going about their business without having to be told what was next.  Testing the hardness was done with a shoe - they knew when it was ready for each phase by the depression left (or not) when the concrete was stepped on.  After the control joints were cut, the crew laid burlap on the surface to allow us to wet the concrete down over the next few days and allow proper curing rather than drying.

Another day on the job when the thunderstorms rolled in as the crew was finishing and the rain dropped the temperature by about 15 degrees which was a welcome relief. High temps today hit 100 plus degrees and the walls held  the heat inside another 10-15 degrees higher.  We had two 5 gallon coolers of water and the crew went through most of that.

Friday is scheduled for the delivery of the supplies for the stud walls in the basement and the flooring for the main floor.  Monday the crew should start installing the walls/floor and we'll remove the braces by the end of the week.  After that the main floor stud walls and roof will go on.

5:30 and all is quiest

First light - that's the vapor barrier covering the high-density, termite-resistant foam.   5" in all but the strip footing and post support areas which are 3" higher density foam.  Wire mess is covering all the plastic and the rebar ties from the wall system are bent down so they will be encased in the concrete poured later today.


6:13 and the first concrete hits the foam and vapor barrier

They're pulling the wire grid up into the concrete so it is embedded on all sides.  At several points it looked like the concrete was about to go over the top of their boots but I didn't see anyone have to dump a boot out.  One did have to change to taller boots though!  David, in the orange shirt, is the pump operator controlling the flow of concrete and position of the boom bia a remote on a belt at his waist.

This is the end of the first truckload of concrete - that's an 8' wide strip footing that runs 2/3 the length of the hosue.

This is the business end of the concrete - concrete truck backs up to the pumper, pours the concrete into the hopper and it's pumped up and through the tube. Operator has a remote control that allows him to run the truck from the application end without seeing the truck.  A horn sounds when concrete starts to flow and stops.  Two beeps signifies that the concrete truck is empty.

8:50 and the last concrete is pumped

10:25 and already the hand troweling and power troweling are well under way. Note the footprints in the concrete at this point

12:23 and putting the finishing touches on the surface - at this point they're squirting water down and applying that "polish" to the surface.  

1:15 and the control joins are being cut.  They first marked chalk-lines on the concrete and then Clayton followed them with a dry concrete saw (other than when the rain came and knocked the dust down (thankfully!).  Crew packed up and I left at about 2:30. Before we left the crew put a layer of burlap down - picture of that tomorrow.
While this was a day that had period of "watching concrete cure" it was interesting to see the precision these guys worked with as they poured the concrete and worked it into the flat floor that will be our basement.  These guys were on the road at 3:45 this morning heading to the job site and departed after 2:30 with about 1 hour and 45 minutes drive ahead of them.  I have to tip my hat to their professionalism and drive - the only "complaint" I heard all day was that it was hot and I have to say, that was a real understatement to say the least.  I think the heat index was over 110 and had to be higher inside that wall system. It's pretty amazing how all that foam intensifies that heat and increases the temp. Oh, and add the humidity of the curing concrete to all that.  Kudos to the whole team for the great work they did today!

Wednesday, July 13, 2011

Waterproofing, pre-slab prep and underslab rough-in for plumbing.

It's been a busy week - Ideal set the replacement panel yesterday afternoon so all the walls are now in place.  Kevin and I spent the better part of yesterday and part of this morning caulking the seams in preparation for the slab pour.

The plumber was on site yesterday laying out the pipes for the downstairs bathroom (shower drain and toilet) so we had to have specific information for him including the toilet rough-in size (10", 12" or 14") and where the drain would be in the shower.   We were prepared so that wasn't any surprise - and the plumbers ran their test water column in prep for the inspection by the county today.

Today the concrete slab crew showed up to the do the gravel work in prep for setting the foam insulation, rebar, and vapor barrier.  This is another awesome crew - you can tell by the look of the gravel when they left the site today, they do extraordinary work.  We had a small glitch when the supplier called today saying they can't get our high density foam until Tuesday.  What that means is our pour will now be scheduled for Thursday to allow time for the final work on the pre-slab and the inspection prior to the pour.

I spent the day waterproofing the sub-grade parts of the panels 6 50# sacks of Thoroseal mixed and applied with a roller.

The front of the house which faces due Nortn

East side of the house

The cracked panel comes out

and the new one swings into place

That's 14,000 pounds of panel!

Here's what it looks like in prep for the foam and rebar - Clayton's team worked that gravel into a carpet!

The black "bucket" in the gravel is the waste lift station for the basement bath - drains for shower and toilet are the white PVC to the right of it

Just for perspective this is the house from overhead - looking East to West.